top of page

ST. MARYS DOWNTOWN DRAINAGE PROJECT

  • Location: St. Marys, GA

  • Client: City of St. Marys

  • Engineer: P&A Engineering

  • Contract Value: $582,041

​

Project Details:

​

  • Removal of existing box culverts, RCP and headwalls.

  • Construction of new box culverts, RCP and drainage structures.

  • Restoration of all driveways, roadways and ditches.

  • All work was completed under detour in downtown St. Marys.

bottom of page