Roadways provide our communities with convenient paths for the transport of people and goods both locally, nationally, and internationally. Since our inception in 2007, Petticoat-Schmitt has had the pleasure of being part of numerous roadway projects in North Florida/South Georgia. Throughout those projects, we have engaged in a variety of roadway construction services including: demolition of existing roadways and underground utilities, construct new roadways, curbs, gutters, sidewalks, storm drains, sewers, on-site storm drain systems, pond work, signalization, and more.

SAN MARCO BLVD STREETSCAPE
Location: Jacksonville, FL
Client: City of Jacksonville, and Jacksonville Electric Authority (JEA)
Engineer: R-A-M Professional Group, Inc.
Contract Value: $6,313,755
Project Details:
Demolition of existing downtown roadway including existing underground utilities.
Construction of a new roadway with curbs and gutters, sidewalks, brick pavers, irrigation and landscaping.
New storm drain, sanitary sewer, potable water, underground electric, signalization and site lighting were installed while maintaining service and access to existing businesses and residents.
Project Highlights: The project was designed and built in nine small phases to minimize impact to the local community. Each phase was built to completion prior to moving to the next phase thereby minimizing the area under construction at any one time. The contract was accelerated for the first four phases to reduce the contract time spent in the commercial district of this roadway.
Client: City of Jacksonville, and Jacksonville Electric Authority (JEA)
Engineer: R-A-M Professional Group, Inc.
Contract Value: $6,313,755
Project Details:
Demolition of existing downtown roadway including existing underground utilities.
Construction of a new roadway with curbs and gutters, sidewalks, brick pavers, irrigation and landscaping.
New storm drain, sanitary sewer, potable water, underground electric, signalization and site lighting were installed while maintaining service and access to existing businesses and residents.
Project Highlights: The project was designed and built in nine small phases to minimize impact to the local community. Each phase was built to completion prior to moving to the next phase thereby minimizing the area under construction at any one time. The contract was accelerated for the first four phases to reduce the contract time spent in the commercial district of this roadway.

OCEANWAY TOWN CENTER STREETSCAPE
Location: Jacksonville, FL
Client: City of Jacksonville
Engineer: HDR Engineering / Bowen Civil Engineering
Contract Value: $1,231,678
Project Details:
Demolition of existing sidewalks and curbs for installation of new curbs and gutters, sidewalks, brick pavers, street lighting, irrigation and landscaping.
Milling and resurfacing of roadways with new textured crosswalks, striping and signage.
Construction of small area park with cast-in-place seat walls and planters, flagpole and ornamental signage.
Project Highlights: Without adding to the project schedule, additional work was performed to repair existing storm drain prior to milling and resurfacing roadways.

COUNTY ROAD 210 & I-95
Phase 2 Improvements
Location: Saint Johns County, FL
Client: St. Johns County & JEA
Engineer: Elie Assi, PE Eisman & Russo Consult Engrs.
Contract Value: $9,980,775
Project Details:
Addition of (1) through lane of travel in each direction, replacement of Sampson Creek Box Culvert and installation of Steel Sheet Pile Wall into existing pond. Work includes curb & gutter, Traffic Signal Mastarms, Overhead Signs, Roadway Construction, Traffic Medians, and Pond Expansion, Renovation of (2) Pump Stations Pavement Markings, Roadway Signage.
Client: St. Johns County & JEA
Engineer: Elie Assi, PE Eisman & Russo Consult Engrs.
Contract Value: $9,980,775
Project Details:
Addition of (1) through lane of travel in each direction, replacement of Sampson Creek Box Culvert and installation of Steel Sheet Pile Wall into existing pond. Work includes curb & gutter, Traffic Signal Mastarms, Overhead Signs, Roadway Construction, Traffic Medians, and Pond Expansion, Renovation of (2) Pump Stations Pavement Markings, Roadway Signage.

JACKSONVILLE BEACH IMPROVEMENTS PHASE II
Location: Jacksonville Beach, FL
Client: City of Jacksonville Beach Duval County, FL
Engineer: GAI Consultants
Contract Value: $6,264,302
Project Details:
Mill & Overlay, Base & Shoulder Work, Drainage Improvements, Curb & Gutter, Streetscaping, Lighting, Water and Sewer improvements, Striping and Signing, Restroom Facility, Roadway Brick Pavers (1) Roundabout, specialty furnishings.
Client: City of Jacksonville Beach Duval County, FL
Engineer: GAI Consultants
Contract Value: $6,264,302
Project Details:
Mill & Overlay, Base & Shoulder Work, Drainage Improvements, Curb & Gutter, Streetscaping, Lighting, Water and Sewer improvements, Striping and Signing, Restroom Facility, Roadway Brick Pavers (1) Roundabout, specialty furnishings.

OLD ST. AUGUSTINE AND I-95
Location: Jacksonville, FL
Client: FDOT
Engineer: Greg Bowyer, PE Wantman Group, Inc.
Contract Value: $4,.85,991.00
Project Details:
Construction of approx. 1.25 miles of new roadway. the resurfacing of all lanes of I-95 and the addition of one auxiliary lane, Northbound and Southbound, to the stretch of I-95 between Old St. Augustine Road and I-295 in Jacksonville, FL. Other minor activities include signalization/signing improvements, “special ditch” construction (rather than retention/detention ponds), and construction of a rigid-shoulder barrier wall along one of the exit ramps.
Client: FDOT
Engineer: Greg Bowyer, PE Wantman Group, Inc.
Contract Value: $4,.85,991.00
Project Details:
Construction of approx. 1.25 miles of new roadway. the resurfacing of all lanes of I-95 and the addition of one auxiliary lane, Northbound and Southbound, to the stretch of I-95 between Old St. Augustine Road and I-295 in Jacksonville, FL. Other minor activities include signalization/signing improvements, “special ditch” construction (rather than retention/detention ponds), and construction of a rigid-shoulder barrier wall along one of the exit ramps.

COLLINS ROAD
Location: Jacksonville, FL
Client: City of Jacksonville & Jacksonville Electric Authority (JEA)
Engineer: HDR / RS&H Better Jacksonville Management Team (Design Engineer: Ayers and Associates)
Contract Value: $5,366,662
Project Details:
Construction of new two-lane and four-lane urban roadway section with curb and gutter, bike lane and concrete sidewalk.
Scope of work includes extensive off site drainage improvements, installation of onsite storm drain system with retention pond, utility relocation, roadway construction, installation of two signalized intersections and roadway lighting.
Client: City of Jacksonville & Jacksonville Electric Authority (JEA)
Engineer: HDR / RS&H Better Jacksonville Management Team (Design Engineer: Ayers and Associates)
Contract Value: $5,366,662
Project Details:
Construction of new two-lane and four-lane urban roadway section with curb and gutter, bike lane and concrete sidewalk.
Scope of work includes extensive off site drainage improvements, installation of onsite storm drain system with retention pond, utility relocation, roadway construction, installation of two signalized intersections and roadway lighting.