COLLINS ROAD

  • Location: Jacksonville, FL

  • Client: City of Jacksonville & Jacksonville Electric Authority (JEA)

  • Engineer: HDR / RS&H Better Jacksonville Management Team (Design Engineer: Ayers and Associates)

  • Contract Value: $5,366,662

Project Details:

  • Construction of new two-lane and four-lane urban roadway section with curb and gutter, bike lane and concrete sidewalk.

  • Scope of work includes extensive off site drainage improvements, installation of onsite storm drain system with retention pond, utility relocation, roadway construction, installation of two signalized intersections and roadway lighting.